Project Scope
A unique approach to a reformer expansion.
- Shop fabricate new roof, wall, and floor panels, structural steel, etc. including shop installed insulation
- Construct furnace expansion, including walls, tubes, etc., during operation
- Remove existing wall during short turn-around
- Increase tubes from 240 to 280
- Increase burners from 108 to 126
- Increase in reformer capacity of 16.6%
- Overall production increase from 1950 tons per day to 2130 tons per day
|